Installing a cryotherapy chamber takes one day on site. Everything that decides whether that day goes well happens weeks earlier, on paper: we validate your electrical and your HVAC before we start building your unit. An Element needs almost nothing. A Vortex or an Ethos needs an electrician, an outdoor condenser location and a 3.5″ wall penetration.
- Six steps: agreement, deposit, production, delivery, installation, training. Installation is step five, not step one
- Element: plug and play. No dedicated wiring, no refrigerant lines, no outdoor condenser, no wall penetration. It rolls in and runs
- Vortex and Ethos: an indoor brain unit, an outdoor condenser on the roof or an exterior wall, two switches, and a 3.5″ penetration for the lines between them
- The room: below 85°F, ideally 60 to 70°F, under 40% humidity, and enough clearance for a 30″ door swing
- What delays projects: electrical that is not ready on delivery day. Almost never the chamber itself
The six steps, from signature to first session
Every Artica installation follows the same six steps. I want operators to see them in order, because the order is the point.
- Agreement. Model, customization, terms
- Deposit. This is also when site preparation starts
- Production. Your specific unit is built on our floor in Milwaukie, Oregon
- Delivery. Crated, to your address
- Installation. On-site setup and technical configuration, one day
- Training. Operational and safety onboarding for your team
Notice where site preparation sits. It is not a step, because it runs alongside steps two and three.
By the time your chamber leaves our floor, we already know what your electrical panel can deliver and where your condenser is going. That is deliberate, and it is the single biggest reason our installations finish in a day.
If you are still deciding between models, start with how to choose a cryotherapy machine, then come back here. This article assumes the decision is made.
What your building actually has to provide
The three chambers ask very different things of a building. The Element was engineered to ask for almost nothing, and that is worth understanding before you assume a cryotherapy chamber means construction.
All three are electric. There is no nitrogen tank to site, no dewar deliveries to schedule and no oxygen monitoring to wire in, which is the first difference an installer notices next to a nitrogen unit. The electric versus nitrogen cost breakdown covers the rest of that comparison.
| Requirement | Element | Vortex | Ethos |
|---|---|---|---|
| Dedicated electrical work | No | Yes | Yes |
| Electrical draw (60 Hz) | Standard supply, no dedicated wiring | 3-phase 24.9 A or 1-phase 50.1 A at 208-240 V | 3-phase 43.1 A or 1-phase 88 A at 208-240 V |
| Outdoor condenser | None | Roof or exterior wall, 341 lbs | Roof or exterior wall, 341 lbs |
| Wall penetration | None | 3.5″ for electrical and refrigerant lines | 3.5″ for electrical and refrigerant lines |
| External HVAC or ventilation | None | Building HVAC, airflow at or above 6 ACH | Building HVAC, airflow at or above 6 ACH |
| Indoor brain unit | Integrated | 36″ x 16″ x 72″, right, left or rear wall | 36″ x 16″ x 72″, right, left or rear wall |
| Total space, chamber plus brain plus door swings | 76″ W x 36″ D x 88″ H | 100″ W x 89″ D x 116″ H | 103″ W x 95″ D x 116″ H |
| Weight on your floor | 1,200 lbs | 500 lbs chamber, 200 lbs brain | 1,361 lbs chamber, 200 lbs brain |
| Typical site work | None | Electrician plus condenser mount | Electrician plus condenser mount |
The Element line in that table is not marketing. It genuinely removes the specific wiring, the refrigerant piping and the external condenser.

Where the brain unit and the condenser go
For the Vortex and the Ethos, the brain unit sits indoors against the right, left or rear wall of the chamber. It needs a 36″ opening clearance to be brought in and serviced.
The condenser goes outside, on the roof or an exterior wall, and the standard allowance is up to 85 feet of line between the two. Longer runs are possible, they just need a conversation with us first.

The power draw in the table is also the number behind your electricity bill. To turn it into a monthly figure, the operating cost article does that math.
Why we validate your site before we build your chamber
This is the part of the process nobody advertises, and it is the part that decides your timeline.
After your deposit, you receive a site preparation packet through your ArtiCare account. It asks for two things: your electrical situation and your HVAC situation. You fill in what you have, or your contractor does it for you, and our engineering team reviews it.
Electrical validation
We check what your panel can deliver against what the chamber draws, in the phase configuration you actually have. Your electrician sizes the circuit to the National Electrical Code, NFPA 70, and to local amendments. What we confirm is that the building can carry the load before anyone buys a breaker.
HVAC validation
A Vortex or an Ethos rejects heat into the room and needs airflow at or above 6 air changes per hour. Any mechanical contractor who works to ASHRAE Standard 62.1 will recognize the figure and know how to reach it.
We validate the electrical separately from the HVAC, because they fail for different reasons and they get fixed by different trades.
The instructions go to your contractor
If something does not work, you hear it then, while your chamber is still being built, and while a panel upgrade or a condenser relocation is a scheduling question rather than an emergency.
If everything checks out, we send the installation instructions directly to your contractor. The person holding the drill reads our specification, not a summary of a summary. The refrigerant connection between the brain unit and the condenser is made by an EPA Section 608 certified technician, the same certification any commercial HVAC installer already holds.
I have watched the alternative at other facilities: equipment arrives, the electrician discovers the panel cannot carry it, and a $200,000 room sits idle for six weeks. Validating before production costs us time upfront. It saves our clients far more than it costs us.
If you want to know where your building stands before you commit to anything, send us your site details and we will tell you.
Planning the cryotherapy room
The chamber does the cooling, but the cryotherapy room it sits in changes how hard the chamber has to work.
- Temperature: keep it below 85°F. The ideal range is 60 to 70°F. Above that the system still runs, it just works harder between sessions
- Humidity: under 40%. Humid rooms produce frost where you do not want frost
- Airflow: at or above 6 air changes per hour for the Vortex and the Ethos
- Clearance: the space figures in the table above already include a 30″ door swing for the chamber and the brain unit. Plan the room around the total, not the chamber footprint
- Connectivity: ethernet or wifi. Predictive maintenance needs the chamber online to work

One thing that surprises people: a treatment room that runs slightly cool is good for the equipment and good for the experience. Clients step out of a chamber into that room, and a 68°F room feels like relief. An 82°F hallway feels like a wall.
How cold the chamber itself gets is a separate question, and it has its own article.
What actually causes delays
In my experience there are three, and only one of them is common.
Electrical not finished on delivery day
This is the one. The electrician is booked for the week after delivery instead of the week before, and a chamber sits in a hallway. Book the electrician against the production window, not against the delivery date.
Condenser placement decided late
The condenser needs an outdoor spot on the roof or an exterior wall, with 42″ by 42″ of operating space and a path back to the brain unit inside 85 feet. In leased buildings this sometimes means landlord approval, and landlord approval takes as long as it takes. Start that conversation at deposit.
Access to the room
Doorways, corners and elevators. We need 36″ of opening clearance for the brain unit. Measure the narrowest point on the path, not the doorway of the room.

Adding capacity later without touching the walls
If you install an Element and your demand grows, you do not have to redo the room. The Element was designed to scale through add-ons that connect to two rear-mounted half inch NPT ports, compatible with garden hose, PEX, copper or braided lines.
| Configuration | Sessions per hour | Added cost |
|---|---|---|
| Standard, no add-ons | 5 | None |
| Vent tube directing heat outdoors, fan optional | 6 to 7 | $50 to $200 |
| Radiator pod wheeled into an adjacent room | 7 to 9 | About $2,250 |
Going from five sessions an hour to nine for roughly $2,250, without an electrician or any construction, is the kind of upgrade path I wish more equipment offered. Plan the room so a radiator pod has somewhere to go, and you have bought yourself years of headroom.
Throughput is also what your pricing rests on. Nine sessions an hour changes what a membership model can carry, and it changes the payback math on the whole room.
Frequently asked questions
A cryotherapy chamber installation takes one day on site, followed by team training. That assumes the electrical is finished and the condenser location is ready, which is exactly what the site preparation review confirms before your unit ships. The full timeline from agreement to first session depends on production and on how quickly your building work gets scheduled.
An Element needs 76″ by 36″ of floor and 88″ of height, door swing included. A Vortex needs 100″ by 89″ by 116″ and an Ethos 103″ by 95″ by 116″, and those figures already include the indoor brain unit and both door swings. Plan the cryotherapy room around the total, not the chamber footprint.
The Element runs on a standard supply with no dedicated wiring. The Vortex draws 24.9 A on three phase or 50.1 A on single phase, at 208 to 240 V. The Ethos draws 43.1 A on three phase or 88 A on single phase. Your electrician sizes the circuit, and we confirm your panel can carry it before production starts.
The Element does not. Its refrigeration is self-contained, so it needs no condenser, no refrigerant lines and no wall penetration. The Vortex and the Ethos do: a 341 lb condenser on the roof or an exterior wall, connected to the indoor brain unit through a 3.5″ wall penetration, with up to 85 feet of line between the two.
The Element needs no external ventilation or HVAC. The Vortex and the Ethos reject heat into the room and need building airflow at or above 6 air changes per hour, with the room under 40% humidity and below 85°F. A mechanical contractor sees those figures in the site preparation packet and knows what to do with them.
Yes. Installation, US mainland shipping, training and a 12-month warranty are included in the price of every Artica chamber. What is not included is the work your building needs on its own side, typically the electrician and the condenser mount for a Vortex or an Ethos.
You find out during the site preparation review, before production, not on delivery day. From there it is usually a choice between a panel upgrade, the single phase configuration instead of three phase, or the Element, which sidesteps the question entirely.